Table 26. Estimated costs of deferred projects to construct or repair and renovate science and engineering research space in academic institutions, by field and type of project: FY 2015

(Costs in millions of dollars)

Field All costs Included in institutional plans Not included in institutional plans
Construct Repair or renovate Construct Repair or renovate
All research space 20,492.2 9,474.0 4,850.1 2,201.6 3,966.5
Agricultural sciences 1,957.0 1,037.4 399.5 270.5 249.6
Biological and biomedical sciences 4,235.3 1,771.6 1,183.1 387.4 893.3
Computer and information sciences 658.8 307.5 79.1 180.0 92.2
Engineering 3,764.6 1,897.6 559.5 642.7 664.8
Geosciences, atmospheric, and ocean sciences 783.3 353.0 249.2 0.0 181.0
Health sciences 4,383.3 2,344.0 982.9 275.2 781.1
Mathematics and statistics 202.7 82.0 58.1 0.0 62.5
Natural resources and conservation 154.7 56.0 61.2 24.4 13.1
Physical sciences 2,734.4 1,279.6 697.3 209.9 547.6
Psychology 632.6 146.8 246.0 92.0 147.8
Social sciences 657.7 54.6 262.5 71.1 269.6
Other 327.8 144.0 71.7 48.5 63.6