Science and Engineering Research Facilities
Fiscal Year 2017
Table | S&E Research Facilities in Academic Institutions Research space |
| by field |
1 | by research animal space: FYs 2007–17 |
2 | by research animal space and type of institution: FY 2017 |
3 | ranked by total net assignable square feet: FY 2017 |
4 | by condition: FY 2017 |
5 | by state, control, and institution: FY 2017 |
6 | shared among fields and used for purposes other than research: FY 2017 |
| by type of institution |
7 | shared among fields and used for purposes other than research: FY 2017 |
| New construction |
8 | by type of institution and time of construction: FYs 2006–19 |
9 | by field, research animal space, and time of construction: FYs 2006–19 |
| by state, control, institution, and field |
10 | started in FY 2016 or FY 2017 |
11 | planned to start in FY 2018 or FY 2019 |
| Costs for new construction |
12 | by field, research animal space, and time of construction: FYs 2006–19 |
| by type of institution and time of construction |
13 | for research animal space: FYs 2006–17 |
14 | total costs and space: FYs 2006–19 |
| by state, control, institution, and field |
15 | started in FY 2016 or FY 2017 |
16 | planned to start in FY 2018 or FY 2019 |
17 | by state, control, institution, and time of construction: FYs 2006–19 |
| Costs for repair and renovation |
18 | by field, research animal space, and time of repair and renovation: FYs 2006–19 |
19 | by type of institution and time of repair and renovation: FYs 2006–19 |
| by state, control, institution, and field |
20 | started in FY 2016 or FY 2017 |
21 | planned to start in FY 2018 or FY 2019 |
22 | by state, control, institution, and time of repair and renovation: FYs 2006–19 |
| Institutions with repair and renovation or new construction projects |
23 | by type of institution: Started in FY 2016 or FY 2017 |
| Source of funds for new construction or repair and renovation |
| by type of institution: FY 2016 or FY 2017 |
24 | new construction |
25 | repair and renovation |
| by year of project start and type of institution: FYs 1986–2017 |
26 | for new construction |
27 | for repair and renovation |
| Estimated costs of deferred construction or repair and renovation projects: FY 2017 |
28 | by field and type of project |
29 | by type of institution and project |
March 2019
Data from survey cycle FY 2017
(finalized 27 October 2018)
Technical Notes:
(187 KB)
These notes provide information necessary for a data user to appropriately interpret the data tables. This information includes the following:
- Survey coverage
- Survey design
- Data comparability
Technical notes are available
here (PDF format, 187 KB).
March 2019
Data from survey cycle FY 2017
(finalized 27 October 2018)